single field multiple input
I would like to get your kind help for the database I am creating now.. I have a field "Action" which is a look-up wizard and will type later the values I want. What I need is, to track all the action of a person. For example I would make a record for Person A then I would need list down all actions needed for him. I would like to use the field "Action" many times. I like to put command button beside "Action" then when... -
Hi Narender, I would like to get your kind help for the database I am creating now.. I have a field "Action" which is a look-up wizard and will type later the values I want. What I need is, to track all the action of a person. For example I would make a record for Person A then I would need list down all actions needed for him. I would like to use the field "Action" many times. I like to put command button beside "Action"...Leave a comment:
-
I have been informed to change the graphics card to a greater size... atleast 128MB minimum... please any one can confirm me about this and tell me please if this is the only way to upgrade my unit....Leave a comment:
-
AutoCAD system requirements
Hi
Could any one can tell me on below list which one I need to upgrade for my system to run AutoCAD 2010 more faster when it comes on opening huge files:
Processor : Intel(R) Core(TM) i3 CPU M 330@2.13GHz
Memory (RAM): 4.00GB
Graphics : Intel(R) HD Graphics
Primary hard disk : 287GB total
System type : 32-bit operating system
number of processor cores : 2
64 bit capable : yes
Display... -
Sorry Narender, I have just forgot to change the word "Percent Progress" as I have saved it differently. It is now working fine.. Thanks a lot for your helpLeave a comment:
-
Thank you, Narender. Got your point, thanks for the idea. It is now working so fine. Thanks a lot!Leave a comment:
-
limit answer in access calculated field
Hi, I have a calculated field in access form which computes the percent progress:
The formula I have used is:
and this working fine.Code:Percent Progress = (Date()-([Planned Start Date]-1))/[Activity Duration]
But I want the answer to stop at 100% when it reached 100%.. and will not continue as days increasing it will reached 200%, 300%, etc higher.
Anyone who could help me please..