  • =?Utf-8?B?QWw=?=

    I need help with calculating business days

    I am working in vb2005. how can I calculate business days (not including
    holidays and weekends) between 2 dates? thanks
    Al

  • rowe_newsgroups

    #2
    Re: I need help with calculating business days

    On Apr 15, 10:28 am, Al <A...@discussio ns.microsoft.co mwrote:
    I am working in vb2005. how can I calculate business days (not including
    holidays and weekends) between 2 dates? thanks
    Al
    It's pretty easy to determine weekends, but how are you going to
    determine what a holiday is? Are you going off your company's holiday
    schedule?

    Thanks,

    Seth Rowe [MVP]

    Comment

    • Martin H.

      #3
      Re: I need help with calculating business days

      Hello Al,

      You can get the number of days between two dates by using the DateDiff
      function. To calculate the number of business days, you can use this code:

      Private Sub Test()
      Dim Date1 As New Date(2008, 4, 15)
      Dim Date2 As New Date(2008, 5, 31)

      MsgBox("There are " & CStr(CalculateB usinessDays(Dat e1, Date2, 6) & _
      " business days" & vbCrLf & "for the time frame of " & _
      Date1.ToShortDa teString & " - " & Date2.ToShortDa teString))
      End Sub

      Private Function CalculateBusine ssDays(ByVal Date1 As Date, ByVal _
      Date2 As Date, ByVal BusinessDaysPer Week As Long) As Long
      Dim Weeks As Long, BusinessDays As Long
      Dim tDate As Date = Date1

      If Not Weekday(tDate) = 1 Then
      'Week starts with Sunday. If the date is not a sunday, add the
      'required days.
      tDate = DateAdd(DateInt erval.Day, 8 - Weekday(tDate), tDate)
      End If

      'Calculate whole weeks.
      Weeks = Fix(CDec(DateDi ff(DateInterval .Day, tDate, Date2)) / CDec(7))

      'Calculate business days for the previously calculated weeks.
      BusinessDays = Weeks * BusinessDaysPer Week

      If Not (Date1.Equals(t Date)) Then
      'If we had to add days before, reverse this now by adding the
      'required days to BusinessDays.
      BusinessDays += DateDiff(DateIn terval.Day, Date1, tDate)
      End If

      'If the second date is not a sunday, add the required days.
      BusinessDays += Weekday(Date2) - 1

      'Calculation complete.
      Return BusinessDays
      End Function

      Best regards,

      Martin

      Am 15.04.2008 22:28, schrieb Al:
      I am working in vb2005. how can I calculate business days (not including
      holidays and weekends) between 2 dates? thanks
      Al
      >

      Comment

      • Brian S.

        #4
        Re: I need help with calculating business days

        not sure but this Weeks = Fix(CDec(DateDi ff(DateInterval .Day, tDate,
        Date2)) / CDec(7))
        complains about a decimical to long conversion and when I do Weeks =
        cint(Fix(CDec(D ateDiff(DateInt erval.Day, tDate, Date2)) / CDec(7))) the
        calcuation is not correct?

        "Martin H." <hkshk@gmx.netw rote in message news:4804ce44$1 @127.0.0.1...
        Hello Al,
        >
        You can get the number of days between two dates by using the DateDiff
        function. To calculate the number of business days, you can use this code:
        >
        Private Sub Test()
        Dim Date1 As New Date(2008, 4, 15)
        Dim Date2 As New Date(2008, 5, 31)
        >
        MsgBox("There are " & CStr(CalculateB usinessDays(Dat e1, Date2, 6) & _
        " business days" & vbCrLf & "for the time frame of " & _
        Date1.ToShortDa teString & " - " & Date2.ToShortDa teString))
        End Sub
        >
        Private Function CalculateBusine ssDays(ByVal Date1 As Date, ByVal _
        Date2 As Date, ByVal BusinessDaysPer Week As Long) As Long
        Dim Weeks As Long, BusinessDays As Long
        Dim tDate As Date = Date1
        >
        If Not Weekday(tDate) = 1 Then
        'Week starts with Sunday. If the date is not a sunday, add the
        'required days.
        tDate = DateAdd(DateInt erval.Day, 8 - Weekday(tDate), tDate)
        End If
        >
        'Calculate whole weeks.
        Weeks = Fix(CDec(DateDi ff(DateInterval .Day, tDate, Date2)) / CDec(7))
        >
        'Calculate business days for the previously calculated weeks.
        BusinessDays = Weeks * BusinessDaysPer Week
        >
        If Not (Date1.Equals(t Date)) Then
        'If we had to add days before, reverse this now by adding the
        'required days to BusinessDays.
        BusinessDays += DateDiff(DateIn terval.Day, Date1, tDate)
        End If
        >
        'If the second date is not a sunday, add the required days.
        BusinessDays += Weekday(Date2) - 1
        >
        'Calculation complete.
        Return BusinessDays
        End Function
        >
        Best regards,
        >
        Martin
        >
        Am 15.04.2008 22:28, schrieb Al:
        >I am working in vb2005. how can I calculate business days (not including
        >holidays and weekends) between 2 dates? thanks
        >Al
        >>

        Comment

        • HKSHK

          #5
          Re: I need help with calculating business days

          Hello Brian,

          I usually have the option "Strict" set to "Off" while your's is set to
          "On"...

          Weeks = CLng(Fix(CDec(D ateDiff(DateInt erval.Day, tDate, Date2)) /
          CDec(7)))

          Should do the trick (since "Weeks" is a Long variable, you need to use
          CLng).

          Best regards,

          Martin

          On Apr 16, 6:48 am, "Brian S." <bsgalla...@com munity.nospamwr ote:
          not sure but this Weeks = Fix(CDec(DateDi ff(DateInterval .Day, tDate,
          Date2)) / CDec(7))
          complains about a decimical to long conversion and when I do Weeks =
          cint(Fix(CDec(D ateDiff(DateInt erval.Day, tDate, Date2)) / CDec(7))) the
          calcuation is not correct?
          >
          "Martin H." <hk...@gmx.netw rote in messagenews:480 4ce44$1@127.0.0 .1...
          Hello Al,
          >
          You can get the number of days between two dates by using the DateDiff
          function. To calculate the number of business days, you can use this code:
          >
          Private Sub Test()
          Dim Date1 As New Date(2008, 4, 15)
          Dim Date2 As New Date(2008, 5, 31)
          >
          MsgBox("There are " & CStr(CalculateB usinessDays(Dat e1, Date2, 6) & _
          " business days" & vbCrLf & "for the time frame of " & _
          Date1.ToShortDa teString & " - " & Date2.ToShortDa teString))
          End Sub
          >
          Private Function CalculateBusine ssDays(ByVal Date1 As Date, ByVal _
          Date2 As Date, ByVal BusinessDaysPer Week As Long) As Long
          Dim Weeks As Long, BusinessDays As Long
          Dim tDate As Date = Date1
          >
          If Not Weekday(tDate) = 1 Then
          'Week starts with Sunday. If the date is not a sunday, add the
          'required days.
          tDate = DateAdd(DateInt erval.Day, 8 - Weekday(tDate), tDate)
          End If
          >
          'Calculate whole weeks.
          Weeks = Fix(CDec(DateDi ff(DateInterval .Day, tDate, Date2)) / CDec(7))
          >
          'Calculate business days for the previously calculated weeks.
          BusinessDays = Weeks * BusinessDaysPer Week
          >
          If Not (Date1.Equals(t Date)) Then
          'If we had to add days before, reverse this now by adding the
          'required days to BusinessDays.
          BusinessDays += DateDiff(DateIn terval.Day, Date1, tDate)
          End If
          >
          'If the second date is not a sunday, add the required days.
          BusinessDays += Weekday(Date2) - 1
          >
          'Calculation complete.
          Return BusinessDays
          End Function
          >
          Best regards,
          >
          Martin
          >
          Am 15.04.2008 22:28, schrieb Al:
          I am working in vb2005. how can I calculate business days (not including
          holidays and weekends) between 2 dates? thanks
          Al

          Comment

          • =?Utf-8?B?QWw=?=

            #6
            RE: I need help with calculating business days

            Thnks to every one. I will try this and get back

            "Al" wrote:
            I am working in vb2005. how can I calculate business days (not including
            holidays and weekends) between 2 dates? thanks
            Al
            >

            Comment

            • Russ

              #7
              Re: I need help with calculating business days

              On Apr 16, 9:40 am, Al <A...@discussio ns.microsoft.co mwrote:
              Thnks to every one. I will try this and get back
              >
              >
              >
              "Al" wrote:
              I am working in vb2005. how can I calculate business days (not including
              holidays and weekends) between 2 dates? thanks
              Al- Hide quoted text -
              >
              - Show quoted text -
              I am not sure if this will help you but, I created this program in
              1991 using the "Natral Adabas language" on a mainframe computer. This
              was written as a callable subroutine, I think even if you do not know
              the NATURAL language you can figure out what this program does. The
              holdiays are the State of Washington holdiays



              0020 ** PROGRAM : NXTWKDAY COMPUTES NEXT WORKING DAY.
              0030 ** WRITTEN BY: R NESBITT
              0040 ** CREATED : MAY OF 1991
              0050 **
              0060 ** COMPUTES THE FOLLOWING HOLIDAYS . . .
              0070 ** NEW YEARS DAY = JAN 1
              0080 ** MARTIN LUTHER KINGS B-DAY = 3RD MONDAY IN JAN
              0090 ** PRESIDENTS DAY = 3RD MONDAY IN FEB
              0100 ** MEMORIAL DAY = LAST MONDY IN MAY
              0110 ** INDEPENDENCE DAY = 4TH OF JULY
              0120 ** LABOR DAY = 1ST MONDAY IN SEPTEMBER
              0130 ** VETERANS DAY = 11TH OF NOV
              0140 ** THANKSGIVING = 4TH THURSDAY AND FRIDAY IN NOV
              0150 ** CHRISTMAS = 25TH OF DEC
              0160 **
              0170 ** IF A HOLIDAY FALLS ON A SATURDAY THEN THE HOLIDAY IS FRIDAY.
              0180 ** IF A HOLIDAY FALLS ON A SUNDAY THEN THE HOLIDAY IS MONDAY.
              0190 **
              0200 **
              0620 **
              0630 DEFINE DATA PARAMETER
              0640 1 #NEXT-WRK-DAY (D)
              0650 LOCAL
              0660 1 #INPUT-DATE (D)
              0670 1 #NEXT-DAY (D)
              0680 1 #DAYOWK (A2)
              0690 1 #WRK-MONTH (A2)
              0700 1 #WRK-DAY (A2)
              0710 1 #THURSDAY (A2)
              0720 1 #FRIDAY (A2)
              0730 1 #SATURDAY (A2)
              0740 1 #SUNDAY (A2)
              0750 1 #MONDAY (A2)
              0760 END-DEFINE
              0770 *
              0780 * THIS MOVES THE FIRST TWO CHARACTERS TO THE DAY IN UPPER LOWER
              CASE
              0790 *
              0800 MOVE H'E388' TO #THURSDAY /* Th
              0810 MOVE H'C699' TO #FRIDAY /* Fr
              0820 MOVE H'E281' TO #SATURDAY /* Sa
              0830 MOVE H'E2A4' TO #SUNDAY /* Su
              0840 MOVE H'D496' TO #MONDAY /* Mo
              0850 *
              0860 IF #NEXT-WRK-DAY GT 0
              0870 DO
              0880 MOVE #NEXT-WRK-DAY TO #INPUT-DATE
              0990 DOEND /* (0870)
              1000 ELSE
              1010 MOVE *DATX TO #INPUT-DATE
              1020 *
              1030 COMPUTE #NEXT-DAY = #INPUT-DATE + 1
              1040 *
              1050 MOVE EDITED #NEXT-DAY (EM=NN) TO #DAYOWK
              1060 MOVE EDITED #NEXT-DAY (EM=MM) TO #WRK-MONTH
              1070 *
              1080 DECIDE ON FIRST VALUE OF #DAYOWK
              1090 VALUE #SATURDAY
              1100 COMPUTE #NEXT-WRK-DAY = #NEXT-DAY + 2
              1110 VALUE #SUNDAY
              1120 COMPUTE #NEXT-WRK-DAY = #NEXT-DAY + 1
              1130 NONE
              1140 MOVE #NEXT-DAY TO #NEXT-WRK-DAY
              1150 END-DECIDE /* (1080)
              1160 *
              1170 MOVE EDITED #NEXT-WRK-DAY (EM=DD) TO #WRK-DAY
              1180 MOVE EDITED #NEXT-WRK-DAY (EM=NN) TO #DAYOWK
              1190 MOVE EDITED #NEXT-WRK-DAY (EM=MM) TO #WRK-MONTH
              1200 DECIDE ON FIRST VALUE OF #WRK-MONTH
              1210 VALUE '01'
              1220 PERFORM COMPUTE-JAN
              1230 VALUE '02'
              1240 IF #WRK-DAY = MASK(15-21) AND #DAYOWK = #MONDAY /*PRES DAY
              */
              1250 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 1
              1260 VALUE '05'
              1270 IF #WRK-DAY = MASK(25-31) AND #DAYOWK = #MONDAY /*MEMORIAL
              DAY*/
              1280 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 1
              1290 VALUE '07'
              1300 PERFORM COMPUTE-JUL
              1310 VALUE '09'
              1320 IF #WRK-DAY = MASK(01-07) AND #DAYOWK = #MONDAY /*LABOR
              DAY*/
              1330 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 1
              1340 VALUE '11'
              1350 PERFORM COMPUTE-NOV
              1360 VALUE '12'
              1370 PERFORM COMPUTE-DEC
              1380 NONE
              1390 IGNORE
              1400 END-DECIDE /* (1200)
              1410 *
              1420 *************** **************
              1430 DEFINE SUBROUTINE COMPUTE-JAN
              1440 *************** **************
              1450 *
              1460 IF #WRK-DAY = MASK(01-02) /**** NEW YEARS DAY ****/
              1470 DO
              1480 DECIDE ON FIRST VALUE #DAYOWK
              1490 VALUE #FRIDAY
              1500 IF #WRK-DAY = MASK(01-01)
              1510 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 3
              1520 VALUE #MONDAY
              1530 IF #WRK-DAY = MASK(01-02)
              1540 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 1
              1550 NONE
              1560 IF #WRK-DAY = '01'
              1570 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 1
              1580 END-DECIDE /* (1480)
              1590 DOEND /* (1470)
              1600 *
              1610 ELSE /**** MLK JR BIRTHDAY ****/
              1620 IF #WRK-DAY = MASK(15-21) AND #DAYOWK = #MONDAY
              1630 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 1
              1640 RETURN /* (1430)
              1650 *************** **************
              1660 DEFINE SUBROUTINE COMPUTE-JUL
              1670 *************** **************
              1680 *
              1690 IF #WRK-DAY = MASK(03-06) /**** INDEPENDENCE DAY ****/
              1700 DO
              1710 DECIDE ON FIRST VALUE #DAYOWK
              1720 VALUE #FRIDAY
              1730 IF #WRK-DAY = MASK(03-04)
              1740 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 3
              1750 VALUE #MONDAY
              1760 IF #WRK-DAY = MASK(04-05)
              1770 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 1
              1780 NONE
              1790 IF #WRK-DAY = '04'
              1800 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 1
              1810 END-DECIDE /* (1710)
              1820 DOEND /* (1700)
              1830 *
              1840 RETURN /* (1660)
              1850 *************** **************
              1860 DEFINE SUBROUTINE COMPUTE-NOV
              1870 *************** **************
              1880 *
              1890 IF #WRK-DAY = MASK(10-13) /**** VETERANS DAY ****/
              1900 DO
              1910 DECIDE ON FIRST VALUE #DAYOWK
              1920 VALUE #FRIDAY
              1930 IF #WRK-DAY = MASK(10-11)
              1940 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 3
              1950 VALUE #MONDAY
              1960 IF #WRK-DAY = MASK(11-12)
              1970 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 1
              1980 NONE
              1990 IF #WRK-DAY = '11'
              2000 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 1
              2010 END-DECIDE /* (1910)
              2020 DOEND /* (1900)
              2030 ELSE /* (1890)
              2040 IF #WRK-DAY = MASK(22-28) /*** THANKSGIVING HOLIDAYS ***/
              2050 DO
              2060 DECIDE ON FIRST VALUE #DAYOWK
              2070 VALUE #THURSDAY
              2080 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 4
              2090 VALUE #FRIDAY
              2100 IF #WRK-DAY NE '22'
              2110 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 3
              2120 NONE
              2130 IGNORE
              2140 END-DECIDE /* (2060)
              2150 DOEND /* (2050)
              2160 ELSE
              2170 IF #WRK-DAY = '29' AND #DAYOWK = #FRIDAY
              2180 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 3
              2190 *
              2200 RETURN /* (1860)
              2210 *************** **************
              2220 DEFINE SUBROUTINE COMPUTE-DEC
              2230 *************** **************
              2240 *
              2250 IF #WRK-DAY = MASK(24-27) /**** CHRISTMAS DAY ****/
              2260 DO
              2270 DECIDE ON FIRST VALUE #DAYOWK
              2280 VALUE #FRIDAY
              2290 IF #WRK-DAY = MASK(24-25)
              2300 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 3
              2310 VALUE #MONDAY
              2320 IF #WRK-DAY = MASK(25-26)
              2330 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 1
              2340 NONE
              2350 IF #WRK-DAY = '25'
              2360 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 1
              2370 END-DECIDE /* (2270)
              2380 DOEND /* (2260)
              2390 ELSE /* (2250)
              2400 IF #WRK-DAY = '31' AND #DAYOWK = #FRIDAY /* NEW YEARS HOLIDAY
              ****/
              2410 COMPUTE #NEXT-WRK-DAY = #NEXT-WRK-DAY + 3
              2420 *
              2430 RETURN /* (2220)
              2440 END

              Comment

              • Brian S.

                #8
                Re: I need help with calculating business days

                What advantage do you have over having this option set to "Off". just
                curious.. i'll look it up later though.. just wanted your opinion.

                "HKSHK" <hkshk@gmx.netw rote in message
                news:11ca2913-c4c8-46d9-a872-9594d5e4bab9@k1 g2000prb.google groups.com...
                Hello Brian,
                >
                I usually have the option "Strict" set to "Off" while your's is set to
                "On"...
                >
                Weeks = CLng(Fix(CDec(D ateDiff(DateInt erval.Day, tDate, Date2)) /
                CDec(7)))
                >
                Should do the trick (since "Weeks" is a Long variable, you need to use
                CLng).
                >
                Best regards,
                >
                Martin
                >
                On Apr 16, 6:48 am, "Brian S." <bsgalla...@com munity.nospamwr ote:
                >not sure but this Weeks = Fix(CDec(DateDi ff(DateInterval .Day, tDate,
                >Date2)) / CDec(7))
                > complains about a decimical to long conversion and when I do Weeks =
                >cint(Fix(CDec( DateDiff(DateIn terval.Day, tDate, Date2)) / CDec(7))) the
                >calcuation is not correct?
                >>
                >"Martin H." <hk...@gmx.netw rote in messagenews:480 4ce44$1@127.0.0 .1...
                Hello Al,
                >>
                You can get the number of days between two dates by using the DateDiff
                function. To calculate the number of business days, you can use this
                code:
                >>
                Private Sub Test()
                Dim Date1 As New Date(2008, 4, 15)
                Dim Date2 As New Date(2008, 5, 31)
                >>
                MsgBox("There are " & CStr(CalculateB usinessDays(Dat e1, Date2, 6) & _
                " business days" & vbCrLf & "for the time frame of " & _
                Date1.ToShortDa teString & " - " & Date2.ToShortDa teString))
                End Sub
                >>
                Private Function CalculateBusine ssDays(ByVal Date1 As Date, ByVal _
                Date2 As Date, ByVal BusinessDaysPer Week As Long) As Long
                Dim Weeks As Long, BusinessDays As Long
                Dim tDate As Date = Date1
                >>
                If Not Weekday(tDate) = 1 Then
                'Week starts with Sunday. If the date is not a sunday, add the
                'required days.
                tDate = DateAdd(DateInt erval.Day, 8 - Weekday(tDate), tDate)
                End If
                >>
                'Calculate whole weeks.
                Weeks = Fix(CDec(DateDi ff(DateInterval .Day, tDate, Date2)) / CDec(7))
                >>
                'Calculate business days for the previously calculated weeks.
                BusinessDays = Weeks * BusinessDaysPer Week
                >>
                If Not (Date1.Equals(t Date)) Then
                'If we had to add days before, reverse this now by adding the
                'required days to BusinessDays.
                BusinessDays += DateDiff(DateIn terval.Day, Date1, tDate)
                End If
                >>
                'If the second date is not a sunday, add the required days.
                BusinessDays += Weekday(Date2) - 1
                >>
                'Calculation complete.
                Return BusinessDays
                End Function
                >>
                Best regards,
                >>
                Martin
                >>
                Am 15.04.2008 22:28, schrieb Al:
                >I am working in vb2005. how can I calculate business days (not
                >including
                >holidays and weekends) between 2 dates? thanks
                >Al
                >

                Comment

                • Martin H.

                  #9
                  Re: I need help with calculating business days

                  Hello Brian,

                  One advantage is that you don't have to convert data types into each
                  other (it's like in the old VB6 days) as VB will do that for you.

                  Best regards,

                  Martin

                  Am 17.04.2008 05:23, schrieb Brian S.:
                  What advantage do you have over having this option set to "Off". just
                  curious.. i'll look it up later though.. just wanted your opinion.
                  >
                  "HKSHK" <hkshk@gmx.netw rote in message
                  news:11ca2913-c4c8-46d9-a872-9594d5e4bab9@k1 g2000prb.google groups.com...
                  >Hello Brian,
                  >>
                  >I usually have the option "Strict" set to "Off" while your's is set to
                  >"On"...
                  >>
                  >Weeks = CLng(Fix(CDec(D ateDiff(DateInt erval.Day, tDate, Date2)) /
                  >CDec(7)))
                  >>
                  >Should do the trick (since "Weeks" is a Long variable, you need to use
                  >CLng).
                  >>
                  >Best regards,
                  >>
                  >Martin
                  >>
                  >On Apr 16, 6:48 am, "Brian S." <bsgalla...@com munity.nospamwr ote:
                  >>not sure but this Weeks = Fix(CDec(DateDi ff(DateInterval .Day, tDate,
                  >>Date2)) / CDec(7))
                  >> complains about a decimical to long conversion and when I do Weeks =
                  >>cint(Fix(CDec (DateDiff(DateI nterval.Day, tDate, Date2)) / CDec(7))) the
                  >>calcuation is not correct?
                  >>>
                  >>"Martin H." <hk...@gmx.netw rote in messagenews:480 4ce44$1@127.0.0 .1...
                  >>>Hello Al,
                  >>>You can get the number of days between two dates by using the DateDiff
                  >>>function. To calculate the number of business days, you can use this
                  >>>code:
                  >>>Private Sub Test()
                  >>>Dim Date1 As New Date(2008, 4, 15)
                  >>>Dim Date2 As New Date(2008, 5, 31)
                  >>>MsgBox("Ther e are " & CStr(CalculateB usinessDays(Dat e1, Date2, 6) & _
                  >>>" business days" & vbCrLf & "for the time frame of " & _
                  >>>Date1.ToShor tDateString & " - " & Date2.ToShortDa teString))
                  >>>End Sub
                  >>>Private Function CalculateBusine ssDays(ByVal Date1 As Date, ByVal _
                  >>>Date2 As Date, ByVal BusinessDaysPer Week As Long) As Long
                  >>>Dim Weeks As Long, BusinessDays As Long
                  >>>Dim tDate As Date = Date1
                  >>>If Not Weekday(tDate) = 1 Then
                  >>>'Week starts with Sunday. If the date is not a sunday, add the
                  >>> 'required days.
                  >>>tDate = DateAdd(DateInt erval.Day, 8 - Weekday(tDate), tDate)
                  >>>End If
                  >>>'Calculate whole weeks.
                  >>>Weeks = Fix(CDec(DateDi ff(DateInterval .Day, tDate, Date2)) / CDec(7))
                  >>>'Calculate business days for the previously calculated weeks.
                  >>>BusinessDa ys = Weeks * BusinessDaysPer Week
                  >>>If Not (Date1.Equals(t Date)) Then
                  >>>'If we had to add days before, reverse this now by adding the
                  >>> 'required days to BusinessDays.
                  >>>BusinessDa ys += DateDiff(DateIn terval.Day, Date1, tDate)
                  >>>End If
                  >>>'If the second date is not a sunday, add the required days.
                  >>>BusinessDa ys += Weekday(Date2) - 1
                  >>>'Calculati on complete.
                  >>>Return BusinessDays
                  >>>End Function
                  >>>Best regards,
                  >>>Martin
                  >>>Am 15.04.2008 22:28, schrieb Al:
                  >>>>I am working in vb2005. how can I calculate business days (not
                  >>>>including
                  >>>>holidays and weekends) between 2 dates? thanks
                  >>>>Al
                  >
                  >