Hello,
I have tried various ways and cannot get through this one.
A [facility] will report [weekly] their [#inches]; this is for tracking measurements only. I am looking to get the sum of #inches for all facilities based only on the [last reported date] of the reported month.
Based on [last reported date] of each [facility] , sum [#inches]
So, facility A reported on 1-3-14 (5 inches), 1-9-14 (10 inches), 1-15-14 (40 inches), and 1-21-14 (2 inches)
1-21-14 = 2 inches for Facility A
1-15-14 = 17 inches for Facility B (following ex above)
...just using 2 for the example
Total Sum = 19 inches for January
I tried incorporating Max with no winners.
Thank you
I have tried various ways and cannot get through this one.
A [facility] will report [weekly] their [#inches]; this is for tracking measurements only. I am looking to get the sum of #inches for all facilities based only on the [last reported date] of the reported month.
Based on [last reported date] of each [facility] , sum [#inches]
So, facility A reported on 1-3-14 (5 inches), 1-9-14 (10 inches), 1-15-14 (40 inches), and 1-21-14 (2 inches)
1-21-14 = 2 inches for Facility A
1-15-14 = 17 inches for Facility B (following ex above)
...just using 2 for the example
Total Sum = 19 inches for January
I tried incorporating Max with no winners.
Thank you
Comment