Hello,
I think a lot of the problems I have been fighting have to do with building
a solution with 1 project being a control, 1 project being a test for that
control, and the control being loaded into the toolbar.
The version in the toolbar is version registered, so it always seems out of
sync.
How do I accomplish this setup cleanly?
Thanks
I think a lot of the problems I have been fighting have to do with building
a solution with 1 project being a control, 1 project being a test for that
control, and the control being loaded into the toolbar.
The version in the toolbar is version registered, so it always seems out of
sync.
How do I accomplish this setup cleanly?
Thanks